We make your painting task easier
General Consent Document
Full Installation Guide
1. BATTEN LAYOUT
PDF
DWG
DXF
2. POLYSTYRENE LAYOUT
3. MESH LAYOUT
4. BASE DETAIL
5. CORNER DETAIL
6. EAVES DETAIL
7. RECESSED WINDOW DETAIL
8. ALUMINIUM DOOR DETAIL
9. NU-THERM WINDOW ISOMETRIC
10. PARAPET AND INT. GUTTER DETAIL
11. PARAPET / ROOF JUNCTION DETAIL
12. PLASTERED PARAPET/BALUSTRADE ISOMETRIC
12a CAPPED PARAPET/BALUSTRADE
13. ROOF FLASHING KICK-OUT DETAIL
14. MEMBRANE DECK
14a ENCLOSED BALUSTRADE TO WALL DETAIL
15. MID-FLOOR CONTROL JOINT
16. VERTICAL CONTROL JOINT
17 & 18 GARAGE HEADER
19 & 20 PENETRATION DETAIL
21. FIXING BLOCK DETAIL
22. DETACHED DECK JUNCTION
23. METER BOX
24. METER BOX ISOMETRIC
25. INTER-STOREY DRAINED JOINT
Specifications
Adobe Finish
GS405.6
Sponge Finish
GS425.6
Adhesive Float Finish
GS430.6
Technical Datasheets
Adhesive Mortar
G1.06NZ
Modified Render
G1.10NZ
G1.25NZ
G1.20NZ
GranoPrime
G1.02NZ
GranoImpact
G2.01NZ
Quality Assurance Checklist
Nu-Therm
Warranty Guide
Warranty Guide Residential Warranty Guide Commercial
Maintenance Checklist
Maintenance Checklist Residential Maintenance Checklist Commercial
BRANZ Appraisal #
Nu-Therm 456 (2005)
Last updated - Thursday August 20, 2009